Answer:
12x42-9x48=72
Step-by-step explanation:
12x42=504
9x48=432
504-432=72
A music store reduces the price of a guitar by taking 10% off the original $350 price. After a few months of not selling, the store decides to take 20% off the guitar’s reduced price. How much does the guitar cost after the second reduction in price?
Hello hehe more help please...
Answer:
your answer is c
Step-by-step explanation:
162 x .35 = 56.70
What is the circumference of a circle with a radius of 24 meters? Use 3.14 for pi.
A. 37.68 meters
B. 75.36 meters
C. 150.72 meters
D. 301.44 meters
HELPPPPPPPPPPPPPPPP 6TH GRADE MATH AP EX HELPPPPPPPPPPPPPPPPPPP
PLEASE HELP ANSWER WHAT U CAN (you don't have to solve the whole page) HELP
Answer:
How u can check to see if clara is right is that you can replace O with 14 and then times 6 and 14 which will get you 84. 84-72= 12
Step-by-step explanation:
This is for question 3 :))
help me please i dont understand the associative, distributive, and commutative property i also cant figure out which one it is
Answer:
Step-by-step explanation:
Convert 9432000 Milliliters to Liters. Show ALL work and don't forgot the units.
Answer: 9,432 L
To convert 9,432,000, divide by 1,000. Let's explain before we divide.
Look at the zeros in 9,432,000, then look at 1,000. What do they have in common? Zeros. Both numbers have 3 zeros. But what would happen if we divide it by 1,000? Let's figure it out now.
1. Divide 9,432,000 by 1,000.
9,432,000 ÷ 1,000 = 9,432Notice how the zeros were gone when we divided it by 1,000, because we're reducing it by 1,000.
Hence, 9,432 L is the answer.
2+2/3 squared Times 63 divided by 9/2
Answer:
5.11111111111 is your answer
Step-by-step explanation:
PLS HELP ASAP I BEG YOU
⚠️MATH QUESTION⚠️ Angle Similarity
Answer:
5 in.
Step-by-step explanation:
If you can see, Triangle ABE has the side with 10 in. and 25 in. on the other side and Triangle FCD has one side with 15 inches, so the bottom one should be 5 in. because decreasing size.
1. Write an expression for each of the following:
a. the sum of 9 and z
b. the difference between 22 and x
c. 8 less than the quotient of x divided by 7
d. x increased by 10 divided by 4
Answer:
a.9+z
b.22-x
c.8-x÷7
d.x+10÷4
can u plz help me in this plz?
Which shape has a greater perimeter?
Answer: Shape B, which is the thin and long rectangle.
Step-by-step explanation:
Shape A:
4 + 4 + 8 + 8
4+4 = 8
8 + 8 = 16
16 + 8 = 24
Shape A has a perimeter of 24.
Shape B:
2 + 2 + 11 + 11
2 + 2 = 4
11 + 11 = 22
22 + 4 = 26
Shape B has a perimeter of 26.
PLz help thank you
i will mark Brainliest
if right answer
Answer:
122
Step-by-step explanation:
for y 11*11 = 121
for x, it's just 1 since 1*1 = 1
and add 121+1
can someone help me with this problem please:
Write and solve the inequality for each word problem. Show work.
1. The waiter makes $10 per hour plus $65 in tips. He wants to earn AT LEAST $150. How many hours should he work?
2. Matteo was told he could spend AT MOST $80 to spend at the mall. He bought lunch for $25. He wants to buy phone cases for his friends. If the phone cases cost $5. How many phone cases can he buy?
Answer:
Step-by-step explanation:
1. [tex]10x+65\geq 150[/tex] and solve for x
[tex]10x+65\geq 150\\[/tex]
-65 -65
[tex]10x\geq 85[/tex]
/10 /10
[tex]x\geq 8.5[/tex] The waiter has to work at least 8.5 hours.
2. [tex]5x+25\leq 80[/tex] and solve for x
[tex]5x+25\leq 80[/tex]
-25 -25
[tex]5x\leq 55[/tex]
/5 /5
[tex]x\leq 11[/tex] Mateo can buy at most 11 phone cases.
Help me please this is due at 11:30
Hue is arranging chairs. She can form 2 rows of a given length with 2 chairs left over, or 6 rows of that same length if she gets 14 more chairs. Complete the equation and solve it to find how many chairs are in that row length. In your equation, use the variable x to represent the number of chairs in each row.
The work of a student to find the dimensions of a rectangle of area 6 + 8x and width 2 is shown below:
Step 1: 6 + 8x
Step 2: 2(4) + 2(6x)
Step 3: 2(4 + 6x)
Step 4: Dimensions of the rectangle are 2 and 4 + 6x
In which step did the student first make an error and what is the correct step? (1 point)
A
Step 3; 2 + (4 + 6x)
B
Step 3; 2 + (4 ⋅ 6x)
C
Step 2; 2(4) + 2(4x)
D
Step 2; 2(3) + 2(4x)
Answer:
its D
Answer
Step-by-step explanation:
I just did it btw
For which equation is y = 7 a solution?
A.) 7y = 1
B.) y - 26 = -19
C.) y + 7 = 0
D.) y - 2 = 9
Answer:B
Step-by-step explanation:
y - 26 = -19
y + 26 - 26 = -19 + 26
y=7
Please help quickly! will give brainliest! no explanation is required. just a correct answer :)
Answer:
Answer : D
Step-by-step explanation:
Determine the value of ? in the figure below.
7 is the answer...........
Which expressions (answer choices below) can be represented by the decimal grids below? Choose all the correct answer choices below.
0.6×4
2.4÷0.06
0.4×6
2.4÷4
2.4÷0.6
The expressions represented by the grid will be 0.6 x 4 and 0.4 x 6. The correct options are A and C.
What is an expression?The mathematical expression combines numerical variables and operations denoted by addition, subtraction, multiplication, and division signs.
Mathematical symbols can be used to represent numbers (constants), variables, operations, functions, brackets, punctuation, and grouping. They can also denote the logical syntax's operation order and other properties.
Given that there is a grid showing the shaded boxes. The expression used to calculate the shaded boxes will be written below,
E₁ = 0.6 × 4
E₂ = 0.4 × 6
Hence, the expressions will be 0.6 x 4 and 0.4 x 6.
To know more about an expression follow
https://brainly.com/question/27269976
#SPJ2
Engineers are digging a 3200-foot-long tunnel at a constant rate. After 5 months, the engineers still need to dig 1700 feet to finish the project. How much time does it take to complete the tunnel from start to finish?
Will the engineers have enough time if the project was started in December 2020 and the deadline to finish the project was in August 2021? Please explain your answer for yes or no.
Hint:
y=mx+b (slope-intercept form)
x=time
y=distance
b=3200
Start & Finish: ??
Total length=3200ft
Left over=1700ft after 5 months of digging
help/
Answer:
Part A answer: 10 2/3 months
Part B answer: No
Step-by-step explanation:
Using what we gathered from the word problem, and the hint, we know that y = distance, x = time, and b = 3200.
3200 is the total number of ft meant for the hole to be dug. If we've been digging for 5 months, and we have 1700 ft yet to be dug, then after 5 months we have dug (3200 - 1700 =) 1500 ft in 5 months.
-1500 ft/5 months = 300 ft/month
-Digging the final 1700 ft will take 5 2/3 months
^ Using this information, we know that the total number of months it takes to dig the entirety of the tunnel is 10 2/3
In the second part of the problem, we're asked to determine whether or not a deadline of August 2021 was enough time to complete the 10 2/3 month-long project if the digging began in December of 2020.
If said project commenced in December 2020, and the deadline was August 2021, then there would be 1, 2, 3, 4, 5, 6, 7, 8... Roughly 8 1/2 months to complete the tunnel. 10 2/3 months is > (greater than) 8 1/2 months. So, no. That start-to-finish deadline would not be enough time.
Good luck!!
A 12-sided die is numbered 1-12. What is P(rolling a number less than 7)
Answer:
1/2
Step-by-step explanation:
This 12-sided die has 6 surfaces (sides) numbered less than 7. Thus,
P(rolling a number less than 7) = 6/12 = 1/2
PLS SOLVE FAST (don't steal)
Factor by finding the GCF: 2x - 4y + 6
Answer:
2(x-2y+3)
Step-by-step explanation:
which one? first or second
Answer:
1÷5
Your Welcome :)
Please hep Im on a time crunch
plz help me
dang gosh plz help me thank you and have a nice day lol
Answer:
The correct answer is B. 300+500+50+20+6+9.
HOPE THIS HELPED YOU :)
If this helped pls mark Brainliest
The can below has a height of 5.5 inches and a diameter of 4.5 inches. Find the lateral and total surface area of the can. Round your answers to the nearest tenth.
im to sleep deprived to think and this is my last question on a review from middle school (sad right?) lol
Alberto studied the distribution of two sets of data. He found that both sets had the same greatest value and the same center. Alberto says that this does not mean the data distributions are the same. Is he correct? Explain.