Why is it a good practice to use functions in programming? Select the best answer.

A.It is faster to run the code using functions.

B.Functions allow us to reuse common code.

C.All of these are correct.

D.It is easier to debug the code using functions.

Answers

Answer 1

Answer:

C. All of these are correct answer from the options for the question that u have given...

Answer 2

The good practice to use functions in programming is all of these are correct. The correct option is C.

What are functions in programming?

The repetitious codes are removed by breaking a program down into functions, which not only reduces the size of the program but also improves its effectiveness. If there were repetitive codes, we would need to alter the program from several locations rather than just one.

As a result, organizing programs into functions aid in good administration and shortens programs by removing repeated code. A functional programming language is a particular kind of language that allows for the creation and application of pure mathematical functions, along with the use of conditional expressions and recursion to carry out various computations.

Therefore, the correct option is C. All of these are correct.

To learn more about functions in programming, refer to the link:

https://brainly.com/question/24297344

#SPJ6


Related Questions

definition of data redundancy​

Answers

Answer:

Data redundancy occurs when the same piece of data exists in multiple places, whereas data inconsistency is when the same data exists in different formats in multiple tables. Unfortunately, data redundancy can cause data inconsistency, which can provide a company with unreliable and/or meaningless information

Where are methods listed in a UML class diagram showing three parts?
in the top third of the diagram
in the middle third of the diagram
in the bottom third of the diagram
anywhere in the diagram a lowercase m is shown

Answers

Answer:

the bottom third

Explanation:

Check out the exampe below.

swim() would be an example of a method.

if you hard working right now go to this EASY question


#BRAINLY and I will give you brainlist something I forgot what's it called for your hard work

Answers

Ok, where is the question so I can try my best?
Whats the question??? Lol

Darren built a tower out of 23 toy blocks. each block has a mass of 7grams. what is the mass of the whole tower?​

Answers

Answer:

161 grams

Explanation:

What are the differences between linear algorithm and iterative algorithm

Answers

Answer:

For example Tower of Hannoi algorithm is made easy by recursion while iterations are widely used, efficient and popular. Recursive vs Iterative Algorithms: Approach: In recursive approach, the function calls itself until the condition is met, whereas, in iterative approach, a function repeats until the condition fails.

Which of these is not a common type of programming design?
~object-oriented design
~structured programming design
~graphic design
~top-down programming design

Answers

Answer:

structured programming design.

Explanation:

Answer:

I can confirm its structured programming design

Explanation:

What is the Denary representation of this 8 bit number > 01001111 ?

Answers

The Denary representation of this 8 bit number 01001111 is 79.

Decimal number

A binary number is a number expressed in the base-2 numeral system or binary numeral system. Binary numbers are either 0 or 1.

The decimal numeral system is the standard system for denoting numbers. Decimals are a set of numbers lying between integers on a number line.

Converting the number 01001111 to decimal:

01001111 = (0 * 2)⁷ + (1 * 2)⁶ + (0 * 2)⁵ +  (0 * 2)⁴ +  (1 * 2)³ +  (1 * 2)² + (1 * 2)¹ + (1 * 2)⁰ = 79

The Denary representation of this 8 bit number 01001111 is 79.

Find out more on Decimal number at: https://brainly.com/question/1827193

Select all the steps needed to create a maintenance schedule. Identify individuals to perform the maintenance. Document or log maintenance that has been performed. Take an inventory of the equipment. Obtain test equipment if necessary. Define maintenance tasks. Review the manufacturers' manuals. Establish frequency of tasks. Run the defragmentation utility. Develop a reminder system.

Answers

Answer:

Maintenance planning and scheduling, arguably the most neglected functions of modern asset management, are at the heart of an effective maintenance management system. Through the use of work orders and a CMMS, maintenance planning covers the daily or weekly planning, scheduling and control activities to ensure that scheduled work is undertaken, and that available resources are being used optimally. Yet many organizations still struggle to make their maintenance planning and scheduling as effective as it should be.

Maintenance planning

Without planning and scheduling, the wrench-on time for a company is on average only 35%. That means that for every technician working an 8-hour day, only 2.8 hours of that day is spent working on assets. Implementing proper maintenance planning and scheduling, however, can increase the wrench time from 35% to 65%. At this level of efficiency, a technician working an 8-hour day will complete 5.2 hours of actual work. With 65% of the engineer’s time being used efficiently, only 35% of their time is wasted. This improvement would enable an organization to move away from a reactive (firefighting) state of maintenance, and improve overall workforce efficiency.

Explanation:

1. Identify the problem

The need for maintenance can be triggered by a failure, a noisy bearing or an oil leak. Once identified, the problem must be reported to the maintenance department. This is normally done through a work request so that planning and scheduling can take place.

2. Plan the maintenance task

‘Planning’ involves deciding on what exactly needs to be done, determining priority, and defining the sequence of activities and skills required. Ensure that all the resources, material, labor, contract services, specialist equipment, tools and information are available. There may even be a need for outside contractors, items to be purchased or work permits to be obtained, all of which must be arranged in advance.

A maintenance planning function is a critical tool for reducing downtime and maximising the value of preventive maintenance. The maintenance planner must therefore have the technical skills and equipment knowledge to do this planning.

3. Schedule the work

‘Scheduling’ involves deciding when to do the work. This will depend on the priority level of the task, and the availability of both the resources and the equipment to be repaired. Many organizations schedule maintenance for a specific period during the working week or month. Weekend maintenance is never desirable because, in many cases, suppliers are not available and personnel are expensive.

The legal requirements with regard to statutory inspections are generally quite rigid, so try and devise a 52-week maintenance plan at the beginning of each year. Review this plan periodically to improve the accuracy and quality of the information. Communicate the preventive and corrective maintenance requirements to production so that they fully understand the need for the maintenance window.

4. Allocate the task to specific people

Although this will depend on organizational arrangements, consider the following:

Allocate your maintenance personnel to specific areas or pieces of equipment

Ensure the allocated person has the skills to perform the task

Be very clear about the type of work that will be allocated to outside contractors

Where necessary, undertake hazard analyses to identify risks and formulate action plans to control access to high-risk areas; your plans should include hot work permits, confined space permits and lockout procedures.

5. Ensure the work is executed properly

It is usually the responsibility of the maintenance supervisor to confirm that the maintenance work meets the required quality standards, usually through selected planned job observations. The planner (or, in some instances, a maintenance scheduler) should monitor outstanding schedules or work requests to ensure that the planned work was actually done.

6. Analyze the problem and decide how to prevent it from happening again

Analyze the root cause of major failures and take corrective action to prevent recurrence. Corrective action could include training, a change to the preventive maintenance programme or equipment redesign. Breakdown or failure of the management process is often overlooked in a major failure. In those cases, corrective action may be a systems upgrade.

When all six of these foundational steps are implemented and combined correctly, maintenance planning can attain much greater levels of efficiency. This leads to important asset-related data and information being shared across the plant, and even across multiple plants. It’s not an overnight process though, so don’t give up if you think it might take too long. The benefits are well worth it.

Identify and eliminate problems quickly and effectively with How-to Guide: How to use a problem-solving A3 Report, an essential guide to compiling an A3 report

True or false: Machine learning lets computers
learn how to do things they weren't
specifically programmed to do.

Answers

Answer:

True

Explanation:

Lin wants to play an online game with her friends. She read the description of the game and knows it contains several features with addictive design, including rewards for completing levels and long game times with penalties for quitting early. She likes the game but doesn’t want to get sucked in and skip her homework (which has happened before)! Name two guidelines Lin should set for herself before playing the game.

Answers

Answer:

Set a time limit for herself. Ask her parents for help monitering her app usage.

Other Questions
Evaluate the following expression What is the average percent of time a student spend sleeping and doing homework?NEED HELP ASAP PLEASE! Suppose you are determining the growth rate of two species of plants. Species A is 25 cm tall and grows 3 cm per month. Species B is 10 cm tall and grows 8 cm per month. Which system of equations models the height of each species H(d) as a function of days d. H(d) = 25 + 3d H(d) = 10 + 8d H(d) = 3 + 25d H(d) = 8 + 10d H(d) = 25 + 3d H(d) = 8 + 10d H(d) = 2 + 8d H(d) = 25 + 10d Which came first, rubber fever, the gold rush, the Civil War, or the Seneca Falls Convention? Here is my house number on Brookview Way. I hope to see you onValentine's Day!CAN SOMEONE HELP ME HELP PLSSS! Which example reflects a main goal of the Preamble to the U.S. Constitution?A)Congress passes a bill to reform tax laws for both individuals and businesses.B)A National Guard unit is sent to help a state prepare for natural disasters.C)The president authorizes humanitarian aid to be sent to another country.D)A jury decides whether a criminal defendant is guilty or not guilty. Answer the question quickly please 3y=24 PLEASE HELP:What is the measure of the angle that is complementary to a) 18 _______a) 25 _________a) 82 _________a) 75 _________Thank you so so much!!! :D On July 1, 2020, Dobbs Co. pays $14,400 to Kalter Insurance Co. for a 3-year insurance contract. Both companies have fiscal years ending December 31. Journalize and post the entry on July 1 and the adjusting entry on December 31 for Kalter Insurance Co. Kalter uses the accounts Unearned Service Revenue and Service Revenue. (Credit account titles are automatically indented when the amount is entered. Do not indent manually. Record journal entries in the order Find the missing values What is the purpose of the last sentence of the conclusion? What might be some of the results of not marketing to children? In paragraph 2, Erika's teammate said, "Our only chance is for someone to get us a copy of the test so we know the answers ahead of time." What was the implicit meaning of her words? She wants Erika to arrange a special study session for the team. She wants Erika to ask the teacher for a preview copy of the text. She wants Erika to steal a copy of the test from the teacher. She wants Erika to write down everything she thinks will be on the test. Solve 4 + 1/5r = -1. Single choice.answer choices:r=25r=-25r=-15 I need help with 1 through 10 in the outsiders book where were opportunities for change Do you agree with the rules of the council on tall buildings and urban habitat regarding spires and antennae? Are the Petronas towers really taller than the Sears tower? provides protection and a space to move and breathe *Umbilical cordAmniotic sacAmniotic fluidplacenta Help A) 9B)4C)9.5D)8 Who got into a fight with Minho at the Gathering?